Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: early construction shots showing pile driving for foundation, stack construction, intake excavation, overviews from bridge.
photCL SCE
Image not available
Visual Materials
Construction and operation photos of Long Beach Steam Plant #1, (boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant #1, dismantling old Long Beach Gas Plant, foundation work for Unit #2), etc.
photCL SCE 13 - vol 082
Image not available
Visual Materials
Construction and operation photos of Long Beach Steam Plant #1, (assembly turbine #1, generator room, boiler room, transformer house, overview from top of [Salt Lake] Bridge), etc.
photCL SCE 13 - vol 081
Image not available
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant No. 1, dismantling old Long Beach Gas Plant, foundation work for Unit No. 2.
photCL SCE

Visual Materials
Long Beach Steam Station, Plant #1 - The erection of towers, the boiler, and smoothing the stack during the construction.
photCL SCE 02 - 00462
Image not available
Visual Materials
End of construction of Long Beach Steam Plant #1 - turbine installations, control rooms, transformers, cooling water system, plant start-up; and start of construction for Plant #2 - excavation, driving piles for Plant 2 foundation.
photCL SCE 13 - vol 085