Construction and operation photos of Long Beach Steam Plant #1



You might also be interested in

  • Image not available

    Long Beach Steam Plant No. 1

    Visual Materials

    Construction and operation of Long Beach Steam Plant No. 1: assembly turbine No. 1, generator room, boiler room, transformer house, overview from top of [Salt Lake] Bridge.

    photCL SCE

  • Image not available

    Construction and operation photos of Long Beach Steam Plant #1

    Visual Materials

    Construction and operation photos of Long Beach Steam Plant #1, (early construction shots showing pile driving for foundation, stack construction, intake excavation, overviews from bridge, boiler erection, material yard, transformer floor, etc.).

    photCL SCE 13 - vol 080

  • Image not available

    Construction and operation photos of Long Beach Steam Plant #1

    Visual Materials

    Construction and operation photos of Long Beach Steam Plant #1, (boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant #1, dismantling old Long Beach Gas Plant, foundation work for Unit #2), etc.

    photCL SCE 13 - vol 082

  • Long Beach Steam Station, Plant #1

    Long Beach Steam Station, Plant #1

    Visual Materials

    Long Beach Steam Station, Plant #1 - Transformer Room addition from top of old Boiler Room.

    photCL SCE 02 - 02056

  • Long Beach Steam Station, Plant #1

    Long Beach Steam Station, Plant #1

    Visual Materials

    Long Beach Steam Station, Plant #1 - General [northwest] view of the Plant from the beach. [At left is the Generator House with the Boiler Room behind it; at right is the Transformer House.]

    photCL SCE 02 - 01473

  • Image not available

    Long Beach Steam Station

    Visual Materials

    Long Beach Steam Station - Plant 3 construction photos, superheater, header, boiler assembly, skylight over Turbo Room, flu opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE 13 - vol 094