Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Long Beach Steam Station



You might also be interested in

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 construction, including superheater, header, boiler assembly, skylight over Turbo Room, flue opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE

  • Image not available

    Long Beach Steam Station

    Visual Materials

    Long Beach Steam Station - Plant 3 construction photos, turbo installation, Boiler #50, laying 15" gas main, to L.B.S.S., driving piles for Unit #11, take-off towers, towers at channel crossing, installing transformers and oil switches, Switching Garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab., fuel oil pump room, exciter, piles ready for steel.

    photCL SCE 13 - vol 092

  • Long Beach Steam Station, Plant #3 - Boiler #52

    Long Beach Steam Station, Plant #3 - Boiler #52

    Visual Materials

    Long Beach Steam Station, Plant #3 - Boiler #52 - View of north end showing warped superheater tubes behind front boiler header.

    photCL SCE 02 - 25678

  • Long Beach Steam Station, Plant #3

    Long Beach Steam Station, Plant #3

    Visual Materials

    Long Beach Steam Station, Plant #3 - Skylight on Boiler Room.

    photCL SCE 02 - 15068

  • Long Beach Steam Station, Plant #3

    Long Beach Steam Station, Plant #3

    Visual Materials

    Long Beach Steam Station, Plant #3 - Skylight on #11 Boiler Room

    photCL SCE 02 - 16379

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.

    photCL SCE