Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant No. 1, dismantling old Long Beach Gas Plant, foundation work for Unit No. 2.
photCL SCE
Image not available
Visual Materials
Construction and operation photos of Long Beach Steam Plant #1, (early construction shots showing pile driving for foundation, stack construction, intake excavation, overviews from bridge, boiler erection, material yard, transformer floor, etc.).
photCL SCE 13 - vol 080
Image not available
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: early construction shots showing pile driving for foundation, stack construction, intake excavation, overviews from bridge.
photCL SCE

Visual Materials
Long Beach Steam Station, Plant #1 - Pile driving detail.
photCL SCE 02 - 00780

Visual Materials
Long Beach Steam Station, Plant #1 - Pile driving detail.
photCL SCE 02 - 00781

Visual Materials
Long Beach Steam Station, Plant #3 - Driving first pile for Plant #3.
photCL SCE 02 - 13917