Construction and operation photos of Long Beach Steam Plant #1
Visual Materials
Construction and operation photos of Long Beach Steam Plant #1, (early construction shots showing pile driving for foundation, stack construction, intake excavation, overviews from bridge, boiler erection, material yard, transformer floor, etc.).
photCL SCE 13 - vol 080
Image not available
Long Beach Steam Plant No. 1
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant No. 1, dismantling old Long Beach Gas Plant, foundation work for Unit No. 2.
photCL SCE
Image not available
Construction and operation photos of Long Beach Steam Plant #1
Visual Materials
Construction and operation photos of Long Beach Steam Plant #1, (boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant #1, dismantling old Long Beach Gas Plant, foundation work for Unit #2), etc.
photCL SCE 13 - vol 082
Image not available
Long Beach Steam Plant No. 1
Visual Materials
End of construction of Long Beach Steam Plant No. 1, including turbine installations, control rooms, transformers, cooling water system, plant start-up; Beginning construction for Plant No. 2, including excavation, driving piles for Plant 2 foundation.
photCL SCE
Image not available
Long Beach Steam Plant No. 1
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: assembly turbine No. 1, generator room, boiler room, transformer house, overview from top of [Salt Lake] Bridge.
photCL SCE
Image not available
Long Beach Steam Station No. 3
Visual Materials
Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.
photCL SCE