Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Visual Materials
End of construction of Long Beach Steam Plant No. 1, including turbine installations, control rooms, transformers, cooling water system, plant start-up; Beginning construction for Plant No. 2, including excavation, driving piles for Plant 2 foundation.
photCL SCE
Image not available
Visual Materials
Long Beach Steam Station - Plant 3 construction photos, turbo installation, Boiler #50, laying 15" gas main, to L.B.S.S., driving piles for Unit #11, take-off towers, towers at channel crossing, installing transformers and oil switches, Switching Garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab., fuel oil pump room, exciter, piles ready for steel.
photCL SCE 13 - vol 092
Image not available
Visual Materials
Construction of Long Beach Steam Plant No. 1, showing later construction of the plant, interior shots, control rooms, and transformers. Construction of support facilities, cooling water intakes and conduits. Expansion of Steam Plant for additional units.
photCL SCE
Image not available
Visual Materials
Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.
photCL SCE

Visual Materials
Long Beach Steam Station, Plant #2 - Driving piles for intake tunnel.
photCL SCE 02 - 11893

Visual Materials
Long Beach Steam Station, Plant #1 - Driving piles for the intake.
photCL SCE 02 - 00417