Visual Materials
Long Beach Steam Station, Plant #1
- Description
- Long Beach Steam Station, Plant #1 - The erection of towers, the boiler, and smoothing the stack during the construction.
- Date
- 11/22/1910
- Call number
- photCL SCE 02 - 00462
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Long Beach Steam Station, Plant #1 - Boiler erection.
photCL SCE 02 - 00772

Visual Materials
Long Beach Steam Station, Plant #1 - Boiler erection.
photCL SCE 02 - 00778

Visual Materials
Long Beach Steam Station, Plant #1 - [Construction of the foundation for stack at Long Beach Steam Plant.]
photCL SCE 02 - 00122

Visual Materials
Long Beach Steam Station, Plant #1 - Forms for the top of stack [Long Beach Steam Plant during construction. (#22)]
photCL SCE 02 - 00123

Visual Materials
Long Beach Steam Station, Plant #1 - Switchboard erection showing back side during construction.
photCL SCE 02 - 00524

Visual Materials
Long Beach Steam Station, Plant #1 - Start of erection of the First Bank boilers during the construction of the Plant #1.
photCL SCE 02 - 00428