Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek, Florence Lake Dam



You might also be interested in

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Arch #13 progress picture showing installation of steel facing. Welding completed on lower portion.

    photCL SCE 02 - 24705

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Arch #13, Welding face plates. Installation of steel facing on arch.

    photCL SCE 02 - 24715

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - View of portion of Arch 8 showing area where Johns-Manville waterpoofing has torn loose from arch. This area was repaired during June 1942, by sealing exposed day's work joints and margins with asbestile waterproofing and covering with reflecting coat of aluminum.

    photCL SCE 02 - 24736

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Extrados of Arch #13 after all chipping and scaling of loose and disintegrated concrete was completed in preparation for the installation of steel facing.

    photCL SCE 02 - 24198

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Arch #13 Skylining 5'x8' sheets from ground to scaffold. Steel facing on arch.

    photCL SCE 02 - 24709

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - One of the four 1.5" diameter drains through the arch approximately 1' above the lower horizontal key before covering with facing steel. Pipes were sulfured and grouted in. 1.5" iron stop cocks were placed on the downstream ends of the pipes.

    photCL SCE 02 - 24703