Visual Materials
Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. Extensive chipping necessary on Arch #40. Joint elevation 7296, centerline to 12' left in order to remove disintegrated concrete. Average depth of chipping 3.5 to 4 inches.
photCL SCE 02 - 22873

Visual Materials
Big Creek, Florence Lake Dam - Arch #13 progress picture showing installation of steel facing. Welding completed on lower portion.
photCL SCE 02 - 24705

Visual Materials
Big Creek, Florence Lake Dam - Arch #13 Skylining 5'x8' sheets from ground to scaffold. Steel facing on arch.
photCL SCE 02 - 24709

Visual Materials
Big Creek, Florence Lake Dam - Arch #13 - Placing sheets on anchor bolts. Steel facing on arch.
photCL SCE 02 - 24711

Visual Materials
Big Creek, Florence Lake Dam - Construction of Florence Lake Dam. Insley steel tower in center of shot with chutes for delivery of concrete to the dam's arch forms.
photCL SCE 02 - 12611

Visual Materials
Big Creek, Florence Lake Dam - Arch #13 progress picture showing installation of steel facing. Ironhide prime coat and 1st. coat of aluminum reflecting coat over lower portion. .
photCL SCE 02 - 24706