Big Creek, Florence Lake Dam
You might also be interested in

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Extrados of Arch No. 13 prior to chipping for gunite and steel facing.
photCL SCE 02 - 24150

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Arch #13 progress picture showing installation of steel facing. Welding completed on lower portion.
photCL SCE 02 - 24705

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. Extensive chipping necessary on Arch #40. Joint elevation 7296, centerline to 12' left in order to remove disintegrated concrete. Average depth of chipping 3.5 to 4 inches.
photCL SCE 02 - 22873

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Arch #13, Welding face plates. Installation of steel facing on arch.
photCL SCE 02 - 24715

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Arch #13 progress picture showing installation of steel facing. Ironhide prime coat and 1st. coat of aluminum reflecting coat over lower portion. .
photCL SCE 02 - 24706

Big Creek, Florence Lake Dam - Arch #13
Visual Materials
Big Creek, Florence Lake Dam - Arch #13 - Applying Ironhide primer to completed section of steel facing. All sheets in place and welded to elevation of scaffold. .
photCL SCE 02 - 24712