Visual Materials
Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - Extrados of Arch No. 13 prior to chipping for gunite and steel facing.
- Date
- 5/5/1942
- Call number
- photCL SCE 02 - 24150
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Extrados of Arch #13 after all chipping and scaling of loose and disintegrated concrete was completed in preparation for the installation of steel facing.
photCL SCE 02 - 24198

Visual Materials
Big Creek, Florence Lake Dam - Arch #13, Welding face plates. Installation of steel facing on arch.
photCL SCE 02 - 24715

Visual Materials
Big Creek, Florence Lake Dam - Arch #13 Skylining 5'x8' sheets from ground to scaffold. Steel facing on arch.
photCL SCE 02 - 24709

Visual Materials
Big Creek, Florence Lake Dam - Old gunite on Arch #20 Extrados.
photCL SCE 02 - 23974

Visual Materials
Big Creek, Florence Lake Dam - Arch #13 progress picture showing installation of steel facing. Welding completed on lower portion.
photCL SCE 02 - 24705

Visual Materials
Big Creek, Florence Lake Dam - Extrados of Arch #2 covered with gunite, Linseed oil etc. .