Big Creek - Powerhouse #3 (part 2) [Generator floor with Units 1, 2, & 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Powerhouse #1 - penstock construction for Unit 3.]
photCL SCE 13 - vol 033
Image not available
Visual Materials
Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.
photCL SCE
Image not available
Visual Materials
Photographs of Powerhouse 2 and 2A, Part Three. Construction at Powerhouse 2A, images depicting the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at Powerhouse 2A.
photCL SCE
Image not available
Visual Materials
Photographs of Powerhouse 2 and 2A, Part Two. Views of auto transformers, substation, new 6600 V line, new bridge for powerhouse extension, Unit No. 4 with direct connected exciter, constructing new Unit No. 4, 150kV - 220kV Bushings, switchboard, installation of new Unit No. 4 penstock, concrete plant, incline batch cars, stand pipes, Unit No. 3 foundation, Unit No. 3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit No. 3, auto circuit breakers, 150kV Oil Switch, new hoist, autotransformers, and 11kV equipment, new Bus Bar installation, Governor No. 4; Camp No. 7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp No. 5 - forebay construction, batch plant, steam shovel excavating.
photCL SCE
Image not available
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Huntington Lake sawmill and logging; Camps 1a, 2, 6, and 7; Dams 1, 3, and 4; Incline railways; Penstocks; Flow pipes; Interior and exterior views of Powerhouse 1 and Powerhouse 2 construction; Tunnel 1; Incline railways. Photographer: Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Sluicing construction sites; Camp 2 Warehouse; Meat storage and butchers; Concrete mixers; Camps 3, 6, and 7; Adit 2, and 3; Cascada yards; Transmission line construction; Excavation and construction at Dams 1, 2, 3, and 4, flowline, penstocks, surge shaft; Incline railway; Tunnels 1, and 2; Huntington Lake. Photographer: Stone & Webster Engineering Corporation.
photCL SCE