Big Creek: Powerhouse No. 3 (part 2)


You might also be interested in

  • Big Creek - Powerhouse #3 (part 2)

    Big Creek - Powerhouse #3 (part 2)

    Visual Materials

    Big Creek - Powerhouse #3 (part 2) [Generator floor with Units 1, 2, & 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Powerhouse #1 - penstock construction for Unit 3.]

    photCL SCE 13 - vol 033

  • Image not available

    F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps

    Visual Materials

    Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.

    photCL SCE

  • Image not available

    Big Creek: Powerhouse No. 2 and 2a (part 3)

    Visual Materials

    Photographs of Powerhouse 2 and 2A, Part Three. Construction at Powerhouse 2A, images depicting the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at Powerhouse 2A.

    photCL SCE

  • Image not available

    Construction of Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction of Big Creek Powerhouse 1 and 2: Huntington Lake sawmill and logging; Camps 1a, 2, 6, and 7; Dams 1, 3, and 4; Incline railways; Penstocks; Flow pipes; Interior and exterior views of Powerhouse 1 and Powerhouse 2 construction; Tunnel 1; Incline railways. Photographer: Stone & Webster Engineering Corporation.

    photCL SCE

  • Image not available

    Construction of Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction of Big Creek Powerhouse 1 and 2: Sluicing construction sites; Camp 2 Warehouse; Meat storage and butchers; Concrete mixers; Camps 3, 6, and 7; Adit 2, and 3; Cascada yards; Transmission line construction; Excavation and construction at Dams 1, 2, 3, and 4, flowline, penstocks, surge shaft; Incline railway; Tunnels 1, and 2; Huntington Lake. Photographer: Stone & Webster Engineering Corporation.

    photCL SCE

  • Image not available

    Big Creek: Powerhouse No. 8 (part 2)

    Visual Materials

    Powerhouse No. 8, Part Two. Photographs of Powerhouse 8 diversion, excavation for powerhouse, diversion tunnel construction, interior shots of Powerhouse No. 8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.

    photCL SCE