Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Camp 7; meat house; Tunnels 3 and 4 east portal; Flowline; Dams 1, 2, 3, and 4; Powerhouse 1 and Powerhouse 2 switchboards; Oil switches; High tension bushings; Stand pipes and surge chamber. Photographer: Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Visual Materials
Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.
photCL SCE

Visual Materials
Construction Big Creek Powerhouse 1 and 2 [PH 1 & PH 2 (interiors & exteriors); Camp 7 Meat House; Tunnels 3 & 4 east portal; flowline; Dams 1, 2, 3, & 4; PH 1 & PH 2 switchboards; oil switches; high tension bushings; stand pipes & surge chamber.]
photCL SCE 13 - vol 006
Image not available
Visual Materials
Tunnels 1, 3, and 8, including intake construction at Tunnel 3, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to sluicing water at outlet, guests standing in 18' penstock, sluicing tunnel; Stevenson Creek, Camps 33, 34, 35, 36, 37 and 38 compressors, Camp 38 mess hall, Camp 33; Cascada - Baldwin 15 ton locomotive No. 4; Tunnel 8 construction, Adit 1; Intake at Dam 1 repairs.
photCL SCE
Image not available
Visual Materials
Early construction photographs of Big Creek, including construction of Penstock 2 and Powerhouse 2; East portal Tunnel 4; Adit 5, backfill on flowline, incline railroad No. 2, Adit 3 Tunnel 2, 84" flowline installation, site for Powerhouse No. 2, Penstock No. 1, and Powerhouse 1 construction. Photographs by Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Visual Materials
Early construction photographs of Big Creek. Includes views of gravel pit, sluicing Powerhouse No. 2 site; Powerhouse 1 under construction; Powerhouse 2 under construction; Units 1 and 2 at Powerhouse 1; Powerhouse 2 switchboard, generator, Hoist No. 2, oil switch room, 6600 V switch room, local service switchboard, generator assembly; Tunnel 2 - adit 1, 2, 3, 4, 5, 6, 7, and 8; Intake to Tunnel 1, 9' flow pipe, west portal Tunnel 1, concreting surge tank at West Portal Tunnel 2. Photographs by Stone & Webster Engineering Corporation.
photCL SCE