Construction Big Creek Powerhouse 1 and 2

1 of 68


You might also be interested in

  • Image not available

    Construction of Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction of Big Creek Powerhouse 1 and 2: Sluicing construction sites; Camp 2 Warehouse; Meat storage and butchers; Concrete mixers; Camps 3, 6, and 7; Adit 2, and 3; Cascada yards; Transmission line construction; Excavation and construction at Dams 1, 2, 3, and 4, flowline, penstocks, surge shaft; Incline railway; Tunnels 1, and 2; Huntington Lake. Photographer: Stone & Webster Engineering Corporation.

    photCL SCE

  • Construction Big Creek Powerhouse 1 and 2

    Construction Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction Big Creek Powerhouse 1 and 2 [PH 1 & PH 2 (interiors & exteriors); Camp 7 Meat House; Tunnels 3 & 4 east portal; flowline; Dams 1, 2, 3, & 4; PH 1 & PH 2 switchboards; oil switches; high tension bushings; stand pipes & surge chamber.]

    photCL SCE 13 - vol 006

  • Construction Big Creek Powerhouse 1 and 2

    Construction Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction Big Creek Powerhouse 1 and 2 [Huntington Lake sawmill & logging; Camps 1a, 2, 6, & 7; Dams 1, 3, & 4; incline railways; penstocks; flow pipes; PH 1 & PH 2 (interiors & exteriors); Tunnel 1; incline railways.]

    photCL SCE 13 - vol 005

  • Image not available

    Construction of Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction of Big Creek Powerhouse 1 and 2: Camp 7; meat house; Tunnels 3 and 4 east portal; Flowline; Dams 1, 2, 3, and 4; Powerhouse 1 and Powerhouse 2 switchboards; Oil switches; High tension bushings; Stand pipes and surge chamber. Photographer: Stone & Webster Engineering Corporation.

    photCL SCE

  • Construction Big Creek Powerhouse 1 and 2 : Powerhouse  1 operating, interior & exterior views, 150kV bus, transformers, Units 1 & 2; Dam 4 & reservoir; PH 2 construction, penstocks, standpipes

    Construction Big Creek Powerhouse 1 and 2 : Powerhouse 1 operating, interior & exterior views, 150kV bus, transformers, Units 1 & 2; Dam 4 & reservoir; PH 2 construction, penstocks, standpipes

    Visual Materials

    Construction Big Creek Powerhouse 1 and 2 [PH 1 operating, interior & exterior views, 150kV bus, transformers, Units 1 & 2; Dam 4 & reservoir; PH 2 construction, penstocks, standpipes.]

    photCL SCE 13 - vol 007

  • F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    Visual Materials

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]

    photCL SCE 13 - vol 009