Construction Big Creek Powerhouse 1 and 2
You might also be interested in
Image not available
Construction of Big Creek Powerhouse 1 and 2
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Huntington Lake sawmill and logging; Camps 1a, 2, 6, and 7; Dams 1, 3, and 4; Incline railways; Penstocks; Flow pipes; Interior and exterior views of Powerhouse 1 and Powerhouse 2 construction; Tunnel 1; Incline railways. Photographer: Stone & Webster Engineering Corporation.
photCL SCE

Construction Big Creek Powerhouse 1 and 2
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [Construction PH 2, & PH 1; Camp 2 Warehouse, meat storage and butchers; concrete mixers; Camps 3, 6, & 7; Adit 2, & 3; Cascada yards; transmission line construction; construction at Dams 1, 2, 3, & 4, flow-line, penstocks, surge shaft; incline railway; Tunnels 1, & 2; Huntington Lake.]
photCL SCE 13 - vol 003

Construction Big Creek Powerhouse 1 and 2
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [PH 1 & PH 2 (interiors & exteriors); Camp 7 Meat House; Tunnels 3 & 4 east portal; flowline; Dams 1, 2, 3, & 4; PH 1 & PH 2 switchboards; oil switches; high tension bushings; stand pipes & surge chamber.]
photCL SCE 13 - vol 006

Construction Big Creek Powerhouse 1 and 2
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [Construction Big Creek Powerhouse 1, & 2; Locomotive #11 in snow; snow survey; Construction Camps 1F, 2, 6, & 7; excavation Tunnels 1, & 2; construction at Dams 1, 2, 3, & 4; penstock & flow-line construction; sawmill; gravel pit; incline railways; Cascada material staging.]
photCL SCE 13 - vol 002
Image not available
Construction of Big Creek Powerhouse 1 and 2
Visual Materials
Construction of Big Creek Powerhouse 1 and 2 [Locomotive No. 11 in snow; snow survey; Construction Camps 1F, 2, 6, and 7; excavation tunnels 1 and 2; construction at Dams 1, 2, 3, and 4; penstock & flow-line construction; sawmill; gravel pit; incline railways; Cascada material staging.] Photographer: Stone & Webster Engineering Corporation.
photCL SCE

Construction Big Creek Powerhouse 1 and 2 : Powerhouse 1 operating, interior & exterior views, 150kV bus, transformers, Units 1 & 2; Dam 4 & reservoir; PH 2 construction, penstocks, standpipes
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [PH 1 operating, interior & exterior views, 150kV bus, transformers, Units 1 & 2; Dam 4 & reservoir; PH 2 construction, penstocks, standpipes.]
photCL SCE 13 - vol 007