Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Construction Big Creek Powerhouse 1 and 2

1 of 87


You might also be interested in

  • Image not available

    Construction of Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction of Big Creek Powerhouse 1 and 2: Huntington Lake sawmill and logging; Camps 1a, 2, 6, and 7; Dams 1, 3, and 4; Incline railways; Penstocks; Flow pipes; Interior and exterior views of Powerhouse 1 and Powerhouse 2 construction; Tunnel 1; Incline railways. Photographer: Stone & Webster Engineering Corporation.

    photCL SCE

  • Image not available

    Construction of Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction of Big Creek Powerhouse 1 and 2 [Locomotive No. 11 in snow; snow survey; Construction Camps 1F, 2, 6, and 7; excavation tunnels 1 and 2; construction at Dams 1, 2, 3, and 4; penstock & flow-line construction; sawmill; gravel pit; incline railways; Cascada material staging.] Photographer: Stone & Webster Engineering Corporation.

    photCL SCE

  • Image not available

    Construction of Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction of Big Creek Powerhouse 1 and 2: Sluicing construction sites; Camp 2 Warehouse; Meat storage and butchers; Concrete mixers; Camps 3, 6, and 7; Adit 2, and 3; Cascada yards; Transmission line construction; Excavation and construction at Dams 1, 2, 3, and 4, flowline, penstocks, surge shaft; Incline railway; Tunnels 1, and 2; Huntington Lake. Photographer: Stone & Webster Engineering Corporation.

    photCL SCE

  • Big Creek - Powerhouse #1 (part 2)

    Big Creek - Powerhouse #1 (part 2)

    Visual Materials

    Big Creek - Powerhouse #1 (part 2) [Powerhouse #1 - drying transformers, 220kV bushings, damaged coils, new 220kV nameplates, Klydontograph, 66kV - 30kV construction substation, new 220kV auto-transformer installations, hoisting transformers, 220 kV Towers, Substation, ruptured penstock, 4th Unit penstock installation, incline concrete batch cars, tunnel for Unit 4 penstock, 3rd Unit penstock installation, 4th unit flow-line, incline hoist.]

    photCL SCE 13 - vol 028

  • Construction Big Creek Powerhouse 1 and 2

    Construction Big Creek Powerhouse 1 and 2

    Visual Materials

    Construction Big Creek Powerhouse 1 and 2 [Construction camps, Commissary, General Office, Engineers Building, gravel pit, crusher-washer plant, warehouses, cook house, dinning hall, operator's cottages, bunk houses, Hoist 2, locomotives #10 & #6, railroad roundhouse, water station, incline railway. Construction: pipeline, Dams 1, 2, & 3, Tunnel 2, west portal, and Adits.]

    photCL SCE 13 - vol 001

  • Big Creek - Powerhouse #2 & 2a (part 2)

    Big Creek - Powerhouse #2 & 2a (part 2)

    Visual Materials

    Big Creek - Powerhouse #2 & 2a (part 2) [Powerhouse 2 & 2A - auto transformers, substation, new 6.6kV line, new bridge for powerhouse extension, Unit #4 with direct connected exciter, constructing new Unit #4, 150kV - 220kV Bushings, switchboard, installation of new Unit #4 penstock, concrete plant, incline batch cars, stand pipes, Unit #3 foundation, Unit #3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit #3, auto circuit breakers, 150kV Oil Switch, new hoist, auto-transformers, and 11kV equipment, new Bus Bar installation, Governor #4; Camp #7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp #5 - forebay construction, batch plant, steam shovel excavating.]

    photCL SCE 13 - vol 030