Big Creek: Powerhouse No. 2 and 2a (part 2)


You might also be interested in

  • Big Creek - Powerhouse #2 & 2a (part 2)

    Big Creek - Powerhouse #2 & 2a (part 2)

    Visual Materials

    Big Creek - Powerhouse #2 & 2a (part 2) [Powerhouse 2 & 2A - auto transformers, substation, new 6.6kV line, new bridge for powerhouse extension, Unit #4 with direct connected exciter, constructing new Unit #4, 150kV - 220kV Bushings, switchboard, installation of new Unit #4 penstock, concrete plant, incline batch cars, stand pipes, Unit #3 foundation, Unit #3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit #3, auto circuit breakers, 150kV Oil Switch, new hoist, auto-transformers, and 11kV equipment, new Bus Bar installation, Governor #4; Camp #7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp #5 - forebay construction, batch plant, steam shovel excavating.]

    photCL SCE 13 - vol 030

  • Image not available

    Big Creek: Powerhouse No. 1 (part 2)

    Visual Materials

    Photographs of Powerhouse No. 1, Part Two. Photographs of drying transformers, 220kV bushings, damaged coils, new 220kV nameplates, Klydontograph, 66kV - 30kV construction substation, new 220kV autotransformer installations, hoisting transformers, 220 kV Towers, Substation, ruptured penstock, 4th Unit penstock installation, incline concrete batch cars, tunnel for Unit 4 penstock, 3rd Unit penstock installation, 4th unit flowline, incline hoist.

    photCL SCE

  • Big Creek - Powerhouse #1 (part 2)

    Big Creek - Powerhouse #1 (part 2)

    Visual Materials

    Big Creek - Powerhouse #1 (part 2) [Powerhouse #1 - drying transformers, 220kV bushings, damaged coils, new 220kV nameplates, Klydontograph, 66kV - 30kV construction substation, new 220kV auto-transformer installations, hoisting transformers, 220 kV Towers, Substation, ruptured penstock, 4th Unit penstock installation, incline concrete batch cars, tunnel for Unit 4 penstock, 3rd Unit penstock installation, 4th unit flow-line, incline hoist.]

    photCL SCE 13 - vol 028

  • Image not available

    Big Creek Powerhouse No. 2 and 2A, Maintenance

    Visual Materials

    Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.

    photCL SCE

  • Image not available

    Big Creek: Powerhouse No. 8 (part 1)

    Visual Materials

    Powerhouse No. 8, Part One. Photographs of Dam 6, Camp 34, Camp 38, overview of Powerhouse 8 and penstock, milling Powerhouse 8 draft tube, operator's cottage, forebay, sluicing tailrace, generator floor, switchboard, rocks washed into tailrace after penstock burst, Unit No. 2 at Pelton Water Wheel Co., generator and governor at Powerhouse 8, penstock vent, transformers and bus, station power sets, switchboard, broken penstock, drilling tunnel No. 8, repaired penstock, steel forebay, Camp 32 cook house, Johnson Valve, Camp 33.

    photCL SCE

  • Image not available

    Big Creek: Powerhouse No. 3 (part 1)

    Visual Materials

    Photographs of Powerhouse No. 3, Part 1. Construction photographs of first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.

    photCL SCE