Visual Materials
Photographs of Powerhouse 2 and 2A, Part Two. Views of auto transformers, substation, new 6600 V line, new bridge for powerhouse extension, Unit No. 4 with direct connected exciter, constructing new Unit No. 4, 150kV - 220kV Bushings, switchboard, installation of new Unit No. 4 penstock, concrete plant, incline batch cars, stand pipes, Unit No. 3 foundation, Unit No. 3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit No. 3, auto circuit breakers, 150kV Oil Switch, new hoist, autotransformers, and 11kV equipment, new Bus Bar installation, Governor No. 4; Camp No. 7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp No. 5 - forebay construction, batch plant, steam shovel excavating.
photCL SCE

Visual Materials
Big Creek - Powerhouse #1 (part 2) [Powerhouse #1 - drying transformers, 220kV bushings, damaged coils, new 220kV nameplates, Klydontograph, 66kV - 30kV construction substation, new 220kV auto-transformer installations, hoisting transformers, 220 kV Towers, Substation, ruptured penstock, 4th Unit penstock installation, incline concrete batch cars, tunnel for Unit 4 penstock, 3rd Unit penstock installation, 4th unit flow-line, incline hoist.]
photCL SCE 13 - vol 028

Visual Materials
Big Creek Powerhouse 2A - Unit #5, showing assembly of 34" disc. valve, relief valve and servo motor, in plant 2A.
photCL SCE 02 - 15933

Visual Materials
Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]
photCL SCE 13 - vol 044
Image not available
Visual Materials
Photographs of Powerhouse No. 1, Part Two. Photographs of drying transformers, 220kV bushings, damaged coils, new 220kV nameplates, Klydontograph, 66kV - 30kV construction substation, new 220kV autotransformer installations, hoisting transformers, 220 kV Towers, Substation, ruptured penstock, 4th Unit penstock installation, incline concrete batch cars, tunnel for Unit 4 penstock, 3rd Unit penstock installation, 4th unit flowline, incline hoist.
photCL SCE

Visual Materials
Big Creek - Powerhouse #2 & 2a (part 3) [Construction at Powerhouse 2A, manufacturing photos showing the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at PH 2A.]
photCL SCE 13 - vol 031