Big Creek - Powerhouse #2, & 2a - maintenance

1 of 87


You might also be interested in

  • Image not available

    Big Creek Powerhouse No. 2 and 2A, Maintenance

    Visual Materials

    Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.

    photCL SCE

  • Big Creek #2 &2A

    Big Creek #2 &2A

    Visual Materials

    Big Creek #2 &2A - Water rheostat used in testing Unit #3.

    photCL SCE 02 - 23481

  • Big Creek - Powerhouse #1 maintenance

    Big Creek - Powerhouse #1 maintenance

    Visual Materials

    Big Creek - Powerhouse #1 maintenance [Powerhouse 1 & penstocks, Dam 4 sluicing, switch-rack, switchboards in PH1, Unit 1 fire, bucket strain-gauge test, bucket molds, bucket repairs, lapping journals, coil replacements in stator, rebuilding Unit 4, removing rotor for repair, break in penstock at PH1, debris and boulders that washed into the powerhouse after penstock break, and details of ripped penstock.

    photCL SCE 13 - vol 043

  • Big Creek - Powerhouse #2 & 2a (part 2)

    Big Creek - Powerhouse #2 & 2a (part 2)

    Visual Materials

    Big Creek - Powerhouse #2 & 2a (part 2) [Powerhouse 2 & 2A - auto transformers, substation, new 6.6kV line, new bridge for powerhouse extension, Unit #4 with direct connected exciter, constructing new Unit #4, 150kV - 220kV Bushings, switchboard, installation of new Unit #4 penstock, concrete plant, incline batch cars, stand pipes, Unit #3 foundation, Unit #3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit #3, auto circuit breakers, 150kV Oil Switch, new hoist, auto-transformers, and 11kV equipment, new Bus Bar installation, Governor #4; Camp #7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp #5 - forebay construction, batch plant, steam shovel excavating.]

    photCL SCE 13 - vol 030

  • Big Creek - Powerhouse #2 & 2a (part 3)

    Big Creek - Powerhouse #2 & 2a (part 3)

    Visual Materials

    Big Creek - Powerhouse #2 & 2a (part 3) [Construction at Powerhouse 2A, manufacturing photos showing the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at PH 2A.]

    photCL SCE 13 - vol 031

  • Big Creek #2 &2A

    Big Creek #2 &2A

    Visual Materials

    Big Creek #2 &2A - Another view of water rheostat in operation.

    photCL SCE 02 - 23480