Visual Materials
Photographs of Powerhouse 2 and 2A, Part Three. Construction at Powerhouse 2A, images depicting the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at Powerhouse 2A.
photCL SCE

Visual Materials
Big Creek 2A - pipe fabrication (3589-A) at Midvale Steel Co. in Pennsylvania. [machining high-tensile steel penstock to design thickness]
photCL SCE 02 - 22945

Visual Materials
Big Creek 2A Pipe fabrication (3497-A). Rough forging of section of pipe for 2A penstock ready for machining.
photCL SCE 02 - 22941

Visual Materials
Big Creek 2A - pipe fabrication (3651-A). Completed section of forged steel pipe with bolted flanged joints for Powerhouse 2A penstock. Largest sections were 66" inside diameter with 3" wall thickness, and 23 feet in length, weighing 27 tons. Picture taken in plant at Midvale Company.
photCL SCE 02 - 22943

Visual Materials
Powerhouse 2 & 2A - Pressure Main anchor and banded steel penstock pipe.
photCL SCE 02 - 15642

Visual Materials
Powerhouse 2 & 2A - Pressure Main anchor and plain steel penstock pipe.