Big Creek: Powerhouse No. 2 and 2a (part 3)


You might also be interested in

  • Big Creek - Powerhouse #2 & 2a (part 3)

    Big Creek - Powerhouse #2 & 2a (part 3)

    Visual Materials

    Big Creek - Powerhouse #2 & 2a (part 3) [Construction at Powerhouse 2A, manufacturing photos showing the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at PH 2A.]

    photCL SCE 13 - vol 031

  • Big Creek 2A  -  pipe fabrication

    Big Creek 2A - pipe fabrication

    Visual Materials

    Big Creek 2A - pipe fabrication (3589-A) at Midvale Steel Co. in Pennsylvania. [machining high-tensile steel penstock to design thickness]

    photCL SCE 02 - 22945

  • Big Creek 2A Pipe fabrication (3497-A)

    Big Creek 2A Pipe fabrication (3497-A)

    Visual Materials

    Big Creek 2A Pipe fabrication (3497-A). Rough forging of section of pipe for 2A penstock ready for machining.

    photCL SCE 02 - 22941

  • Big Creek 2A  -  pipe fabrication

    Big Creek 2A - pipe fabrication

    Visual Materials

    Big Creek 2A - pipe fabrication (3651-A). Completed section of forged steel pipe with bolted flanged joints for Powerhouse 2A penstock. Largest sections were 66" inside diameter with 3" wall thickness, and 23 feet in length, weighing 27 tons. Picture taken in plant at Midvale Company.

    photCL SCE 02 - 22943

  • Powerhouse 2 & 2A

    Powerhouse 2 & 2A

    Visual Materials

    Powerhouse 2 & 2A - Pressure Main anchor and banded steel penstock pipe.

    photCL SCE 02 - 15642

  • Powerhouse 2 & 2A

    Powerhouse 2 & 2A

    Visual Materials

    Powerhouse 2 & 2A - Pressure Main anchor and plain steel penstock pipe.

    photCL SCE 02 - 15643