Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek - Powerhouse #1 maintenance

1 of 121


You might also be interested in

  • Image not available

    Big Creek Powerhouse No. 1, Maintenance

    Visual Materials

    Powerhouse 1 and penstocks, Dam 4 sluicing, switchrack, switchboards in Powerhouse 1, Unit 1 fire, bucket strain-gauge test, bucket molds, bucket repairs, lapping journals, coil replacements in stator, rebuilding Unit 4, removing rotor for repair, break in penstock at Powerhouse 1, debris and boulders that washed into the powerhouse after penstock break, and details of ripped penstock.

    photCL SCE

  • Big Creek - Early Big Creek

    Big Creek - Early Big Creek

    Visual Materials

    Big Creek - Early Big Creek [Substations; Big Creek - PH 1 and PH 2 penstock construction, Huntington Lodge & Lake, heavy snowfall, break in PH1 penstock joint, const. Dam #1 & gate tower, Dam 1 spilling, Dam #2 const., Dam #4 const., PH1 const., PH1 interior, PH2 const., PH2 after fire, PH2 interiors (Units & Transformers), unit install PH1, incline RR, railroad locomotives, Big Creek transmission line const.; Magunden Sub.; Kern T/L poles, line and RR wash out at Arroyo Seco; Long Beach Steam Plant; Los Angeles Aquiduct and Powerhouse; PL&P vehicles; Intake Azusa Plant, Azusa PH interior; Highgrove forebay & Powerhouse; Stone Castle; Sierra Powerhouse interior, operator's cottages; Pedley Powerhouse (ext. & int.), Mentone PH; Borel Powerhouse]

    photCL SCE 13 - vol 041

  • Big Creek - Powerhouse #2, & 2a - maintenance

    Big Creek - Powerhouse #2, & 2a - maintenance

    Visual Materials

    Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]

    photCL SCE 13 - vol 044

  • Stone & Webster Engineering Corp. - Big Creek PH 1 construction

    Stone & Webster Engineering Corp. - Big Creek PH 1 construction

    Visual Materials

    Stone & Webster Engineering Corp. - Big Creek PH 1 construction [Excavation for Powerhouse 1 site and penstock path, PH1 in framing stages, snow at PH1, pouring concrete for PH1, concreting Dam #1, snow plow on railroad, transformer tanks, clearing for transmission line, PH1: switchboards, transformers, oil switches, pressing Unit 1 rotor, generation room, bus room, Unit 1 shaft on bearings, pressing runner on shaft, tanking transformer cores, sub-floor wire conduit layout, 150kV Bus Room.]

    photCL SCE 13 - vol 016

  • Big Creek - Powerhouse #1 (part 2)

    Big Creek - Powerhouse #1 (part 2)

    Visual Materials

    Big Creek - Powerhouse #1 (part 2) [Powerhouse #1 - drying transformers, 220kV bushings, damaged coils, new 220kV nameplates, Klydontograph, 66kV - 30kV construction substation, new 220kV auto-transformer installations, hoisting transformers, 220 kV Towers, Substation, ruptured penstock, 4th Unit penstock installation, incline concrete batch cars, tunnel for Unit 4 penstock, 3rd Unit penstock installation, 4th unit flow-line, incline hoist.]

    photCL SCE 13 - vol 028

  • Image not available

    Big Creek Powerhouse No. 2 and 2A, Maintenance

    Visual Materials

    Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.

    photCL SCE