Big Creek Powerhouse No. 2 and 2A, Maintenance
- Description
Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.
- Date
- 1928 - 1951
- Call number
- photCL SCE
- Provenance
- Gift of Edison International, December 2005.