Big Creek - Powerhouse #3 (part 2)
You might also be interested in
Image not available
Big Creek: Powerhouse No. 3 (part 2)
Visual Materials
Photographs of Powerhouse No. 3, Part 2. Views of generator floor with Units 1, 2, and 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Also penstock construction for Unit 3, Powerhouse No. 1 .
photCL SCE

F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps
Visual Materials
F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]
photCL SCE 13 - vol 009

Big Creek - Powerhouse #2 & 2a (part 3)
Visual Materials
Big Creek - Powerhouse #2 & 2a (part 3) [Construction at Powerhouse 2A, manufacturing photos showing the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at PH 2A.]
photCL SCE 13 - vol 031

Construction Big Creek Powerhouse 1 and 2
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [Construction PH 2, & PH 1; Camp 2 Warehouse, meat storage and butchers; concrete mixers; Camps 3, 6, & 7; Adit 2, & 3; Cascada yards; transmission line construction; construction at Dams 1, 2, 3, & 4, flow-line, penstocks, surge shaft; incline railway; Tunnels 1, & 2; Huntington Lake.]
photCL SCE 13 - vol 003
Image not available
F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps
Visual Materials
Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.
photCL SCE

Construction Big Creek Powerhouse 1 and 2
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [Huntington Lake sawmill & logging; Camps 1a, 2, 6, & 7; Dams 1, 3, & 4; incline railways; penstocks; flow pipes; PH 1 & PH 2 (interiors & exteriors); Tunnel 1; incline railways.]
photCL SCE 13 - vol 005