Visual Materials
Construction photos of Plant #2 at Long Beach Steam Station
You might also be interested in
Image not available
Long Beach Steam Plant No. 2
Visual Materials
Construction Photographs of Plant No. 2 at Long Beach Steam Station. [Several of the 8x10 photographs in this album are labeled as "Plant No. 3" construction. These photographs are actually showing the four unit expansion of Plant No. 2. The first foundation pile for Plant No. 3 was driven on February 5, 1927.]
photCL SCE
Image not available
Construction photos of Plant #2 at Long Beach Steam Station
Visual Materials
Construction photos of Plant #2 at Long Beach Steam Station.
photCL SCE 13 - vol 087
Image not available
Construction and operation photos of Long Beach Steam Plant #1
Visual Materials
Construction and operation photos of Long Beach Steam Plant #1, (boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant #1, dismantling old Long Beach Gas Plant, foundation work for Unit #2), etc.
photCL SCE 13 - vol 082
Image not available
Construction and operation photos of Long Beach Steam Plant #1
Visual Materials
Construction and operation photos of Long Beach Steam Plant #1, (early construction shots showing pile driving for foundation, stack construction, intake excavation, overviews from bridge, boiler erection, material yard, transformer floor, etc.).
photCL SCE 13 - vol 080
Image not available
Construction photos of Plant #3 at Long Beach Steam Station
Visual Materials
Construction photos of Plant #3 at Long Beach Steam Station.
photCL SCE 13 - vol 091
Image not available
Construction photos of Plant #3 at Long Beach Steam Station
Visual Materials
Construction photos of Plant #3 at Long Beach Steam Station.
photCL SCE 13 - vol 090