Construction photos of Plant #2 at Long Beach Steam Station
Visual Materials
Construction photos of Plant #2 at Long Beach Steam Station. [Several of the 8x10 photos in this album are labeled as "Plant #3" construction. These photos are actually showing the four unit expansion of Plant #2. The first foundation pile for Plant #3 was driven on February 5, 1927.]
photCL SCE 13 - vol 088
Image not available
Long Beach Steam Plant No. 1
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant No. 1, dismantling old Long Beach Gas Plant, foundation work for Unit No. 2.
photCL SCE
Image not available
Long Beach Steam Plant No. 1
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: early construction shots showing pile driving for foundation, stack construction, intake excavation, overviews from bridge.
photCL SCE
Image not available
Long Beach Steam Plant No. 2
Visual Materials
Construction Photographs of Plant No. 2 at Long Beach Steam Station.
photCL SCE
Image not available
Long Beach Steam Plant No. 1
Visual Materials
End of construction of Long Beach Steam Plant No. 1, including turbine installations, control rooms, transformers, cooling water system, plant start-up; Beginning construction for Plant No. 2, including excavation, driving piles for Plant 2 foundation.
photCL SCE
Image not available
Long Beach Steam Plant No. 2
Visual Materials
Building foundations for new units, pouring concrete in foundation forms from tower, pouring concrete for additional unit in Plant No. 1, installing fourth boiler bank in Plant No. 1, Plant 2 machine shop, discharge tunnel, steel framework going up, first aid station, and concrete being poured into wall forms.