Visual Materials
Construction photos of Plant #3 at Long Beach Steam Station
You might also be interested in
Image not available
Construction photos of Plant #3 at Long Beach Steam Station
Visual Materials
Construction photos of Plant #3 at Long Beach Steam Station.
photCL SCE 13 - vol 091
Image not available
Construction photos of Plant #2 at Long Beach Steam Station
Visual Materials
Construction photos of Plant #2 at Long Beach Steam Station. [Several of the 8x10 photos in this album are labeled as "Plant #3" construction. These photos are actually showing the four unit expansion of Plant #2. The first foundation pile for Plant #3 was driven on February 5, 1927.]
photCL SCE 13 - vol 088
Image not available
Construction photos of Plant #2 at Long Beach Steam Station
Visual Materials
Construction photos of Plant #2 at Long Beach Steam Station.
photCL SCE 13 - vol 087
Image not available
Construction and operation photos of Long Beach Steam Plant #1
Visual Materials
Construction and operation photos of Long Beach Steam Plant #1, (boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant #1, dismantling old Long Beach Gas Plant, foundation work for Unit #2), etc.
photCL SCE 13 - vol 082

Long Beach Steam Station, Plant #3 - Stack construction
Visual Materials
Long Beach Steam Station, Plant #3 - Stack [construction]
photCL SCE 02 - 15029

Long Beach Steam Station, Plant #3 - Boiler construction
Visual Materials
Long Beach Steam Station, Plant #3 - Boiler construction - back view.
photCL SCE 02 - 16376