Visual Materials
Construction of Big Creek Powerhouse 1 & 2, construction of Huntington Lake Dams 1, 2, & 3, and Dam 4, power tunnels, intakes, etc
You might also be interested in
Image not available
Construction of Big Creek Powerhouse 1 and 2; construction of Huntington Lake Dams 1, 2, and 3, and Dam 4, power tunnels, intakes, etc
Visual Materials
Construction of Big Creek Powerhouse 1 and 2 and Construction of Huntington Lake Dams 1, 2, 3, and 4. Views of tunnels, intakes, dams, reservoirs, lakes, and powerhouses in various stages of construction. Photographer: Stone & Webster Engineering Corporation.
photCL SCE

California Electric Power Corp. - Nevada-California Electric Corp. : Bishop Creek, Intake 2 Dam spilling, No. 2 Pipeline, Power House #1 interior, Sabrina quarry, Plant 4 facilities, Power House 5, and construction of Lake Sabrina and South Lake Dams
Visual Materials
California Electric Power Corp. - Nevada-California Electric Corp. - small collection of prints in soft album of Bishop Creek, Intake 2 Dam spilling, No. 2 Pipeline, Power House #1 interior, Sabrina quarry, Plant 4 facilities, Power House 5, and construction of Lake Sabrina and South Lake Dams.
photCL SCE 13 - vol 153

Construction Big Creek Powerhouse 1 and 2
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [Construction PH 2, & PH 1; Camp 2 Warehouse, meat storage and butchers; concrete mixers; Camps 3, 6, & 7; Adit 2, & 3; Cascada yards; transmission line construction; construction at Dams 1, 2, 3, & 4, flow-line, penstocks, surge shaft; incline railway; Tunnels 1, & 2; Huntington Lake.]
photCL SCE 13 - vol 003

Construction Big Creek Powerhouse 1 and 2
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [Huntington Lake sawmill & logging; Camps 1a, 2, 6, & 7; Dams 1, 3, & 4; incline railways; penstocks; flow pipes; PH 1 & PH 2 (interiors & exteriors); Tunnel 1; incline railways.]
photCL SCE 13 - vol 005
Image not available
Construction of Big Creek Powerhouse 1 and 2
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Sluicing construction sites; Camp 2 Warehouse; Meat storage and butchers; Concrete mixers; Camps 3, 6, and 7; Adit 2, and 3; Cascada yards; Transmission line construction; Excavation and construction at Dams 1, 2, 3, and 4, flowline, penstocks, surge shaft; Incline railway; Tunnels 1, and 2; Huntington Lake. Photographer: Stone & Webster Engineering Corporation.
photCL SCE

California Electric Power Corp. - Southern Sierras Power Co. - Collection of photos taken during the construction of Agnew Lake Dam and Gem Lake Dam to provide head for Rush Creek Powerhouse. Photos of powerhouse construction and movement of materials to construction sites are also included
Visual Materials
California Electric Power Corp. - Southern Sierras Power Co. - Collection of photos taken during the construction of Agnew Lake Dam and Gem Lake Dam to provide head for Rush Creek Powerhouse. Photos of powerhouse construction and movement of materials to construction sites are also included.
photCL SCE 13 - vol 132