California Electric Power Corp. - Nevada-California Electric Corp. : Bishop Creek, Intake 2 Dam spilling, No. 2 Pipeline, Power House #1 interior, Sabrina quarry, Plant 4 facilities, Power House 5, and construction of Lake Sabrina and South Lake Dams

1 of 13


You might also be interested in

  • Image not available

    California Electric Power Corp. - Nevada-California Electric Corp.: Bishop Creek hydroelectric project

    Visual Materials

    Photographs of Bishop Creek, Intake 2 Dam spilling, No. 2 Pipeline, Power House No. 1 interior, Sabrina quarry, Plant 4 facilities, Power House 5, and construction of Lake Sabrina and South Lake Dams. Includes a cyanotype view.

    photCL SCE

  • California Electric Power Corp. - Nevada-California Electric Corp

    California Electric Power Corp. - Nevada-California Electric Corp

    Visual Materials

    California Electric Power Corp. - Nevada-California Electric Corp. - [Intake 2, Dam construction at Lake Sabrina & South Lake, Plant 2 & cottages, Plant 4, recreation building, Plant 5, Silver Peak Sub., Las Vegas Train Station]

    photCL SCE 13 - vol 147

  • California Electric Power Corp. - Nevada Power, Milling, & Mining Co

    California Electric Power Corp. - Nevada Power, Milling, & Mining Co

    Visual Materials

    California Electric Power Corp. - Nevada Power, Milling, & Mining Co. - Vance & Sandy 1926 - Bishop Creek Hydroelectric project - South Lake Dam & Grizzly Bars; and Lake Sabrina Dam; South Lake Diversion Dam; Intake 2 reservoir; Sabrina - survey party; operator's cottage, Plant 4, Intake 5.

    photCL SCE 13 - vol 141

  • California Electric Power Corp. - Nevada-California Electric Corp

    California Electric Power Corp. - Nevada-California Electric Corp

    Visual Materials

    California Electric Power Corp. - Nevada-California Electric Corp. - Rhyolite Sub., Temescal Rock Co. Substation, Banning Sub.; Bishop Creek Hydro - Plant #2, Plant #3, Plant #4, Plant #5, Plant #6, Reservoir #1 [South Lake or Lake Sabrina], Equalizing Reservoir [Intake 2] showing proposed position of Plant #1, Control Station, & Cottages; Victorville Sub., Ransburg Sub., Transmission Line; Otay Dam & Reservoir, Goldfield - Sub., Jumbo Extension, Merger Shaft, Tonopah Sub., El Centro, Tonopah Office, Alkali Sub., Manhattan Sub., Elsinore Sub., San Bernardino Sub., raising transmission towers.

    photCL SCE 13 - vol 150

  • California Electric Power Corp. - Cain Irrigation Co

    California Electric Power Corp. - Cain Irrigation Co

    Visual Materials

    California Electric Power Corp. - Cain Irrigation Co. - Description & Costs for Gem Lake Dam Reinforcement; Final Contract Statement; Rush Meadows Lake, Agnew Lake, Gem Lake & Gem Lake Dam; incline Tramways #1 & #2, hoists; quarry, crushing plant, chuting concrete, construction camps; accounting records.

    photCL SCE 13 - vol 160

  • California Electric Power Corp. : Civil Engineer Samuel Storrow's survey and evaluation report on the hydroelectric potential of the Bishop Creek watershed

    California Electric Power Corp. : Civil Engineer Samuel Storrow's survey and evaluation report on the hydroelectric potential of the Bishop Creek watershed

    Visual Materials

    California Electric Power Corp. - Civil Engineer, Samuel Storrow's survey and detailed evaluation report on the hydroelectric potential of the Bishop Creek watershed. Showing Hillside Reservoir [i.e.. South Lake], Lake Sabrina, construction of Sabrina Dam, [Intake 2] regulating dam below Sabrina, & Hillside [South Lake] Dam; Pine Tree Weir.]

    photCL SCE 13 - vol 159