Visual Materials
California Electric Power Corp. - Nevada-California Electric Corp
You might also be interested in
Image not available
California Electric Power Corp. - Nevada-California Electric Corp.: Photographs of Owens Valley and Las Vegas, Nevada
Visual Materials
Intake 2, Dam construction at Lake Sabrina and South Lake, Plant 2 and cottages, Plant 4, recreation building, Plant 5, Silver Peak Substation, Las Vegas train station and surrounding town.
photCL SCE

California Electric Power Corp. - Nevada-California Electric Corp
Visual Materials
California Electric Power Corp. - Nevada-California Electric Corp. - Rhyolite Sub., Temescal Rock Co. Substation, Banning Sub.; Bishop Creek Hydro - Plant #2, Plant #3, Plant #4, Plant #5, Plant #6, Reservoir #1 [South Lake or Lake Sabrina], Equalizing Reservoir [Intake 2] showing proposed position of Plant #1, Control Station, & Cottages; Victorville Sub., Ransburg Sub., Transmission Line; Otay Dam & Reservoir, Goldfield - Sub., Jumbo Extension, Merger Shaft, Tonopah Sub., El Centro, Tonopah Office, Alkali Sub., Manhattan Sub., Elsinore Sub., San Bernardino Sub., raising transmission towers.
photCL SCE 13 - vol 150

California Electric Power Corp. - Nevada Power, Milling, & Mining Co
Visual Materials
California Electric Power Corp. - Nevada Power, Milling, & Mining Co. - Vance & Sandy 1926 - Bishop Creek Hydroelectric project - South Lake Dam & Grizzly Bars; and Lake Sabrina Dam; South Lake Diversion Dam; Intake 2 reservoir; Sabrina - survey party; operator's cottage, Plant 4, Intake 5.
photCL SCE 13 - vol 141

California Electric Power Corp. - Nevada-California Electric Corp. : Bishop Creek, Intake 2 Dam spilling, No. 2 Pipeline, Power House #1 interior, Sabrina quarry, Plant 4 facilities, Power House 5, and construction of Lake Sabrina and South Lake Dams
Visual Materials
California Electric Power Corp. - Nevada-California Electric Corp. - small collection of prints in soft album of Bishop Creek, Intake 2 Dam spilling, No. 2 Pipeline, Power House #1 interior, Sabrina quarry, Plant 4 facilities, Power House 5, and construction of Lake Sabrina and South Lake Dams.
photCL SCE 13 - vol 153

California Electric Power Corp. - Nevada-California Electric Corp
Visual Materials
California Electric Power Corp. - Nevada-California Electric Corp. - Intake 2 Reservoir on North Fork Bishop Creek, Dam site - Reservoir #2., Lake on Middle Fork of Bishop Creek (Reservoir #1), dam site Reservoir #1, dam & intake, wood stave flowline, construction of a Bishop Creek Powerhouse [looks like Plant #4].
photCL SCE 13 - vol 146

California Electric Power Corp. - Nevada-California Electric Corp
Visual Materials
California Electric Power Corp. - Nevada-California Electric Corp. - Saddlebags Reservoir, Lee Vining Creek Watershed, Tioga Reservoir, Rhinedollar Reservoir, Sylvester Meadows, Rush Meadows Dam and Reservoir, Gem Lake Dam & Reservoir, Agnew Dam and Reservoir, Grant Lake Dam & Reservoir, Cain Ranch, Lee Vining Creek Cascades, Poole Powerhouse substation & penstock, Poole PH interior, Lee Vining Creek Plant No. 3, Mill Creek Plant (Lundy PH), Adams Main Plant exterior & interior (Owens River Gorge), Adams Cottages, and Adams Auxiliary Plant.
photCL SCE 13 - vol 154