Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Upstream protection



You might also be interested in

  • Big Creek, Huntington Lake Dams

    Big Creek, Huntington Lake Dams

    Visual Materials

    Big Creek, Huntington Lake Dams - Upstream protection closer view of marginal channel at east end of Dam #1, showing anchored in place in 12"x12" cut-off in concrete.

    photCL SCE 02 - 43320

  • Upstream protection

    Upstream protection

    Visual Materials

    Upstream protection - View of marginal cut-off in concrete along east slope of Dam #1. Note 6' anchor rods grouted in cut-off to hold marginal channel.

    photCL SCE 02 - 43566

  • Portal Powerhouse - Forebay

    Portal Powerhouse - Forebay

    Visual Materials

    Portal Powerhouse - Forebay - Installing 6" dia. drain in foundation, sluice pipe area, prior to any fill. Note form for concrete cutoff around pipe. One of three installed.

    photCL SCE 02 - 43323

  • Big Creek, Huntington Lake Dams - Upstream Protection

    Big Creek, Huntington Lake Dams - Upstream Protection

    Visual Materials

    Big Creek, Huntington Lake Dams - Upstream Protection - Drilling 6" outlet hole with Concore drill thru Dam #2, for under drain system in steel facing back.

    photCL SCE 02 - 43696

  • Big Creek, Vermilion Dam

    Big Creek, Vermilion Dam

    Visual Materials

    Big Creek, Vermilion Dam - Installing 12" perforated drain [French drain] thru damp area near relief hole R-24. Note sand and gravel aroun pipe.

    photCL SCE 02 - 43702

  • Huntington Lake Dams

    Huntington Lake Dams

    Visual Materials

    Huntington Lake Dams - View of lower marginal channel and collector drain east slope to sluice gates, Dam #1

    photCL SCE 02 - 43705