Big Creek, Huntington Lake Dams
Visual Materials
Big Creek, Huntington Lake Dams - Upstream protection closer view of marginal channel at east end of Dam #1, showing anchored in place in 12"x12" cut-off in concrete.
photCL SCE 02 - 43320

Upstream protection
Visual Materials
Upstream protection - Progress picture at east end of Dam 1. 12"x12" water cutoff completed and 8" marginal channel anchored in place. Installing 8" half-round metal collector drain. Welded clips anchored to dam with Ramset anchors.
photCL SCE 02 - 43328

Upstream Protection progress picture at east end of Dam #1. Marginal channel in place along top and extreme east end down to approx. elevation
Visual Materials
Upstream Protection progress picture at east end of Dam #1. Marginal channel in place along top and extreme east end down to approx. elevation - 6930.
photCL SCE 02 - 43319

Huntington Lake Dams - Upstream protection
Visual Materials
Huntington Lake Dams - Upstream protection - showing pressure exerted against anchor bolts during grouting operation by Prepack Corp.. Note deformation of washer.
photCL SCE 02 - 43537

Big Creek, Huntington Lake Dams - Upstream Protection
Visual Materials
Big Creek, Huntington Lake Dams - Upstream Protection - Tailrace channel upstream from Highway Bridge.
photCL SCE 02 - 43710

Upstream Protection
Visual Materials
Upstream Protection - View of steel plate facing during grouting operation.