Visual Materials
Big Creek: Construction of Dam No. 6, San Joaquin River
You might also be interested in

Big Creek - Construction of Dam #6
Visual Materials
Big Creek - Construction of Dam #6 [Memento Album for the construction of Dam #6 - San Joaquin River, dam site, abutments, drilling test cores in riverbed, building bypass flume, dam construction, copy of blueprint drawing for Dam 6. duplicate album on file - vol 048a]
photCL SCE 13 - vol 048
Image not available
Construction of Dam No. 6, San Joaquin River
Visual Materials
A bound set of 29 commercial photographs showing construction progress of Dam 6 on the San Joaquin River in Fresno County, California, from June 1921 to May 1923. The photographs include views of the river prior to construction, rail lines being built to bring in machines and materials, construction of various sections of the dam, men at work, and the dam upon completion. A one-page printed description of the dam is bound in before the photographs. It is likely that these photographs were taken by Southern California Edison's first company photographer G. Haven Bishop (1879 - 1972).
photCL 140
Image not available
Big Creek: Construction of Dam No. 6, San Joaquin River (copy 2)
Visual Materials
Duplicate of Box 49 album.
photCL SCE
Image not available
Big Creek: Florence Lake and Dam
Visual Materials
Florence Lake dam: maintenance, including miscellaneous paint samples on arches, test slabs, backcountry Powerhouses, spill of water through Ward Tunnel from Florence Lake, flume collapsed from Ward Tunnel spill, Spillway at Florence Lake Dam cresting with logs and debris caught on drum gates, mountains above Florence Lake, and shots of different stages of construction of Florence Lake Dam. Photographer: Pacific Light & Power Corporation.
photCL SCE
Image not available
Colorado River and Herminghaus Ranch
Visual Materials
Core drilling at Kelly Dam site, Arizona and Nevada abutments, Rainbow Bridge natural arch; survey photographs and gauging stations at Herminghaus Ranch.
photCL SCE
Image not available
Big Creek construction
Visual Materials
Big Creek, including tunnel excavation, Bear Dam, Mono Dam, Mono-Bear siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.
photCL SCE