Visual Materials
Album with a printed introductory page detailing the construction of Big Creek Dam No. 6 on the San Joaquin River, including dam site, abutments, drilling test cores in riverbed, and building the bypass flume.
photCL SCE

Visual Materials
Big Creek Powerhouse #3 - Damsite Dam #6 - View showing partly completed bypass flume.
photCL SCE 02 - 08074

Visual Materials
Big Creek - Dams [Dam 1- intake tower (interior & exterior), seepage, sluice pipes, spilling over top and through spillways, automatic siphons; Dam 2 - watchman's house; Dam 3 & 3A; Dam 4 spilling; Dam 5 - site excavation, forms up, diversion flume, dam construction, trash rack, sluicing mud banks, PH 8 forebay construction; Dam 6 - site excavation, construction, coffer dam, diversion, framework, primary rock crusher #9, Tunnel 3 intake, Dam 6 spilling.]
photCL SCE 13 - vol 025

Visual Materials
Big Creek Powerhouse #3 - Dam site for Dam #6 - downstream view showing old riverbed and small current of water which is leaking through.
photCL SCE 02 - 08090
Image not available
Visual Materials
Duplicate of Box 49 album.
photCL SCE

Visual Materials
Big Creek Powerhouse #3 - Construction shot of Dam 6 - long shot.
photCL SCE 02 - 08359