Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Construction of Dam No. 6, San Joaquin River

Image not available



You might also be interested in

  • Image not available

    Big Creek: Construction of Dam No. 6, San Joaquin River

    Visual Materials

    Album with a printed introductory page detailing the construction of Big Creek Dam No. 6 on the San Joaquin River, including dam site, abutments, drilling test cores in riverbed, and building the bypass flume.

    photCL SCE

  • Image not available

    Big Creek: Construction of Dam No. 6, San Joaquin River (copy 2)

    Visual Materials

    Duplicate of Box 49 album.

    photCL SCE

  • Image not available

    Borel, Kern River No. 3, Santa Ana River No. 1, Mill Creek, PL&P construction photos from 1903, and Bear Valley Dam (Union Power Co.)

    Visual Materials

    Photographs of Borel flume and canal work (mostly un-numbered), Borel headworks, Borel Powerhouse, Kern River No. 3 construction, Santa Ana River No. 1 powerhouse, Santa Ana River 1 intake, Santa Ana River 1 settling basin, Santa Ana River No. 2 powerhouse, Mill Creek No. 1 Powerhouse, Mill Creek No. 3 intake, Mill Creek cottages, Santa Ana River No. 3 flume construction, Pacific Light & Power construction Photographs from 1903, Bear Valley Dam (Union Power Co.), Mill Creek 2 and 3 Powerhouse, Santa Ana River flood damage.

    photCL SCE

  • Image not available

    Early construction at Big Creek, Tule River and Kern River

    Visual Materials

    Album compiled by Edison employee containing professional and amateur photographs of Borel interior with Pelton-Francis turbines; Excavation for Big Creek Powerhouse No. 2; Huntington Lake construction for Trestle Dam 1, Dam 2; start of construction at Powerhouse No. 1 and Dam 4, installation of equipment at Powerhouse 1, penstock assembly, completion of Dam 4; construction of Big Creek Powerhouse 2; construction of Powerhouse No. 8, constructing road to Powerhouse 3, and Tule Powerhouse.

    photCL SCE

  • Image not available

    Construction of Big Creek Powerhouse No. 1 and No. 2

    Visual Materials

    Photographs by Stone and Webster Construction Co. documenting construction of Big Creek Powerhouse No. 1 and Powerhouse No. 2 in Fresno Co., California. Job Order No. 1142

    photCL SCE

  • Image not available

    Big Creek construction

    Visual Materials

    Big Creek, including tunnel excavation, Bear Dam, Mono Dam, Mono-Bear siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.

    photCL SCE