Big Creek construction


You might also be interested in

  • Big Creek

    Big Creek

    Visual Materials

    Big Creek - tunnel excavation, Bear Dam, Mono Dam, Mono-Bear Siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.

    photCL SCE 13 - vol 054

  • Image not available

    Big Creek: Shaver Lake No. 2

    Visual Materials

    Shaver Lake No. 2. Shaver Dam construction, including excavation, forms, concrete placement, diversions, Shaver Lake and old dam, aggregate conveyor belt, old dam and intake to Shaver Tunnel, quarry, duplex valve near Dam 2, Bear diversion dam, construction of Shaver Dam, finished dam showing areas with some leakage.

    photCL SCE

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Ward Tunnel outlet, repair screening & concrete mixing plant.

    photCL SCE 02 - 27143

  • Image not available

    F.P.C. Vol. 1, Projects 67 and 120 - Construction of Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion

    Visual Materials

    Florence Reservoir, Florence Tunnel, and Mono-Bear. Views include Big Creek Canyon; Florence Lake Dam site, including diamond drilling, clearing site, crib dam; Florence Lake Dam construction, forms construction; Florence Tunnel intake, tunnel excavation; Mono Dam construction: Mono-Bear junction; Mono-Bear siphon construction.

    photCL SCE

  • Image not available

    Kern River No. 1

    Visual Materials

    Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.

    photCL SCE

  • Image not available

    Big Creek: Mono-Bear and Huntington-Shaver Diversions

    Visual Materials

    Views of Bear Dam, Mono Dam, Mono-Bear pipelines and diversions, and Huntington -Shaver diversions. Construction of Bear Creek Dam and intake structure, and Mono Creek Dam and intake structure, logging area for Mono Creek reservoir, pipeline crossing south fork of San Joaquin River, Camps 71, 72, 73, 80, 81, 82, 83, and 85; Mono-Bear siphon, backfilled siphon and pipeline, tunnels, pipeline installations, outlets of Mono and Bear Tunnels, intake of Bear Tunnel at Camp 86, Intake of Mono tunnel, Big Creek siphon, duplex valve on Huntington-Pitman-Shaver conduit and tunnel, intake for conduit at Dam 2, Warehouse, Mess hall and Hospital at Camp 73.

    photCL SCE