Visual Materials
Big Creek, including tunnel excavation, Bear Dam, Mono Dam, Mono-Bear siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.
photCL SCE

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel outlet, repair screening & concrete mixing plant.
photCL SCE 02 - 27143
Image not available
Visual Materials
Shaver Lake No. 2. Shaver Dam construction, including excavation, forms, concrete placement, diversions, Shaver Lake and old dam, aggregate conveyor belt, old dam and intake to Shaver Tunnel, quarry, duplex valve near Dam 2, Bear diversion dam, construction of Shaver Dam, finished dam showing areas with some leakage.
photCL SCE

Visual Materials
Kern River #1 - site for Democrat Dam, dam construction and drainage tower, intake, dam spilling, construction at Camp 4, flume, Kern River Canyon, Hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles, Camp 1, penstock construction, branch pipes, powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel & buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line, Tejon, Castaic & Fernando Substations, L. A. #3 steam plant...
photCL SCE 13 - vol 063

Visual Materials
Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel office. [testing new concrete dump buckets on railcar next to mixing plant]
photCL SCE 02 - 42256

Visual Materials
Big Creek - Powerhouse #3 (part 1) [first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.]
photCL SCE 13 - vol 032