Big Creek

1 of 130


You might also be interested in

  • Image not available

    Big Creek construction

    Visual Materials

    Big Creek, including tunnel excavation, Bear Dam, Mono Dam, Mono-Bear siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.

    photCL SCE

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Ward Tunnel outlet, repair screening & concrete mixing plant.

    photCL SCE 02 - 27143

  • Big Creek - Shaver Lake #2

    Big Creek - Shaver Lake #2

    Visual Materials

    Big Creek - Shaver Lake #2 [Shaver Dam construction - excavation, forms, concrete placement, diversions, Shaver Lake and old dam, aggregate conveyor belt, old dam & intake to shaver tunnel, quarry, duplex valve near Dam 2, Bear diversion dam, construction of Saver Dam, finished dam showing areas with some leakage.]

    photCL SCE 13 - vol 036

  • Image not available

    Big Creek: Shaver Lake No. 2

    Visual Materials

    Shaver Lake No. 2. Shaver Dam construction, including excavation, forms, concrete placement, diversions, Shaver Lake and old dam, aggregate conveyor belt, old dam and intake to Shaver Tunnel, quarry, duplex valve near Dam 2, Bear diversion dam, construction of Shaver Dam, finished dam showing areas with some leakage.

    photCL SCE

  • Kern River #1

    Kern River #1

    Visual Materials

    Kern River #1 - site for Democrat Dam, dam construction and drainage tower, intake, dam spilling, construction at Camp 4, flume, Kern River Canyon, Hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles, Camp 1, penstock construction, branch pipes, powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel & buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line, Tejon, Castaic & Fernando Substations, L. A. #3 steam plant...

    photCL SCE 13 - vol 063

  • Big Creek - Powerhouse #3 (part 1)

    Big Creek - Powerhouse #3 (part 1)

    Visual Materials

    Big Creek - Powerhouse #3 (part 1) [first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.]

    photCL SCE 13 - vol 032