Visual Materials

Kern River #1

1 of 82


You might also be interested in

  • Image not available

    Kern River No. 1

    Visual Materials

    Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.

    photCL SCE

  • Kern River Project

    Kern River Project

    Visual Materials

    Kern River No. 1, Borel Powerhouse, Kern River No. 3 - KR 1, KR 2, & KR 3, Kings River Power Co., Kings River - Kern River PH #1 & cottages, headworks, Lucac Creek Flume, Cow Creek flume, forebay weir to spillway; Borel Powerhouse with 5 penstocks, Isabella (1907); Kings River #1 Water Appropriation Notice, Kings River #2 - Camp near Mill Creek, posted notice, material storage, warehouse at Tunnel 9; Kings River #3 - South Fork Gorge & Intake site, Crown Valley, Little Brush Creek, construction road, Water Appropriation Notice; Kings River #4 - Tehacipi Basin, lumber yards, water appropriation notice at intake site, P.D. Plant and spillway at mouth of Kern Canyon.

    photCL SCE 13 - vol 102

  • Kern River Plant

    Kern River Plant

    Visual Materials

    Borel intake [original], canals, flumes, flume crossing Kern River, cattle crossing bridge over Borel flume, construction tent camp near canal, crew concreting the canal walls, flume crossing wash, crew excavating canal path, water tunnel, Borel forebay, upper end of penstocks, operator's cottage next to penstocks at Borel, Borel Powerhouse [during construction], Borel interiors, switchboard, Kern River.

    photCL SCE 13 - vol 101

  • Image not available

    Roy K. Wanner's personal album with shots from the Kern River #3 project

    Visual Materials

    Roy K. Wanner's personal album with shots from the Kern River #3 project - construction at Fairview Dam, flume and sandbox construction, tunnel construction, Kern 3 Siphon, flowline, forebay, penstock placement, construction of Powerhouse #3, installation of units in powerhouse; Borel Powerhouse.

    photCL SCE 13 - vol 117

  • Image not available

    Kern River Project; Kings River

    Visual Materials

    Kings River Powerhouse No. 1 and cottages, headworks, Lucas Creek Flume, Cow Creek flume, Borel Powerhouse with 5 penstocks, Isabella (1907); Kings River No. 1 Water Appropriation Notice, Kings River No. 2 - Camp near Mill Creek, posted notice, material storage, warehouse at Tunnel 9; Kings River No. 3 - South Fork Gorge and Intake site, Crown Valley, Little Brush Creek, construction road, Water Appropriation Notice; Kings River No. 4 - Tehachapi Basin, lumber yards, water appropriation notice at intake site, P.D. Plant and spillway at mouth of Kern Canyon.

    photCL SCE

  • Kern River No. 3

    Kern River No. 3

    Visual Materials

    Kern River No. 3 - Concrete mixing plant [at camp above Fairview dam site.]

    photCL SCE 02 - 05251