Early construction at Big Creek, Tule River and Kern River
You might also be interested in
Image not available
Big Creek construction, Kern River, Redondo Steam Station, etc
Visual Materials
Azusa Line; Big Creek construction - Dam 2, towers, Powerhouse 2, Richgrove Patrol Sta.; Borel change to Pelton-Francis horizontal turbines, break in canal, Bodfish Flume, repairs at Schoolhouse Cut, Profanity Flume; San Bernardino "C" Street Substation, Long Beach Steam Plant, Santa Ana River 2; Fillmore Substation; PLandP trucks and wagons; Huntington Beach Substation; East Kern Line; Kern Canal, settling basin, Borel Powerhouse; Mentone - siphon, flume break, fish screen, intake; L.A. City Power Dev. Plant 1; Pedley Powerhouse - break in canal; Redondo Steam Plant; Sierra Powerhouse; Stone Castle, Vernon Substation, Santa Paula Substation, Monolith Substation, and Eagle Rock Substation.
photCL SCE
Image not available
Stone & Webster Engineering Corp. - Big Creek construction photos
Visual Materials
Early construction photographs of Big Creek, including Powerhouse No. 2 construction, including pouring walls and sluicing below Powerhouse No. 2; Camp 7; crushing plant; generator room; Construction at Dams No. 1, No. 2, No. 3 and No. 4; Intake at Dam 1. Photographs by Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake
Visual Materials
Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.
photCL SCE
Image not available
Big Creek projects and Colorado River survey
Visual Materials
Big Creek Project - Penstock sections, Powerhouse No. 1 (Unit 4 installation), Powerhouse No. 2, Florence Lake Dam construction (framing for concrete), Camp Hospitals, Cookhouse, Warehouse, Recreation Hall, Mess Halls, tunnel excavations, Construction Camps (No. 21, No. 64, No. 72, No. 73); Photographs of Colorado River Survey of Sierra Watershed, including Evolution Lake, Garnet Lake, Wanda Lake, Thousand Island Lake, Heart Lake, Desolation Lake, N. Goddard Lake, and Sapphire Lake; Kern River No. 1; Transmission tower construction; [Big Bear dam construction]; Huntington Lake Dam 1; Shaver Dam construction.
photCL SCE
Image not available
Pacific Light & Power Corp. - Big Creek early construction photos
Visual Materials
Early construction photographs of Big Creek. Includes views of gravel pit, sluicing Powerhouse No. 2 site; Powerhouse 1 under construction; Powerhouse 2 under construction; Units 1 and 2 at Powerhouse 1; Powerhouse 2 switchboard, generator, Hoist No. 2, oil switch room, 6600 V switch room, local service switchboard, generator assembly; Tunnel 2 - adit 1, 2, 3, 4, 5, 6, 7, and 8; Intake to Tunnel 1, 9' flow pipe, west portal Tunnel 1, concreting surge tank at West Portal Tunnel 2. Photographs by Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Big Creek, Mill Creek, Kern River, etc
Visual Materials
Big Creek rivers and streams; Powerhouse 2 interior; Cascada general office; Huntington Lake Lodge, Huntington Lake and Dam 1, Shaver Lake, Powerhouse No. 2, Powerhouse No. 8 interior and exterior, Dam 6 and Intake 3, Powerhouse No. 3; Vestal, Eagle Rock Substation, Laguna Bell Substation; Mill Creek No. 1 exterior and interior; Kern River No. 3 exterior and interior, Kern River No. 1 interior; Long Beach Steam Plant No. 1; Camp on Eagle-Bell Line near San Gabriel; Edison Executive portraits; and Edison General Office at 3rd and Broadway, Los Angeles.
photCL SCE