Visual Materials
Big Creek - Powerhouse #2 & 2a (part 2) [Powerhouse 2 & 2A - auto transformers, substation, new 6.6kV line, new bridge for powerhouse extension, Unit #4 with direct connected exciter, constructing new Unit #4, 150kV - 220kV Bushings, switchboard, installation of new Unit #4 penstock, concrete plant, incline batch cars, stand pipes, Unit #3 foundation, Unit #3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit #3, auto circuit breakers, 150kV Oil Switch, new hoist, auto-transformers, and 11kV equipment, new Bus Bar installation, Governor #4; Camp #7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp #5 - forebay construction, batch plant, steam shovel excavating.]
photCL SCE 13 - vol 030
Image not available
Visual Materials
Photographs of Powerhouse 2 and 2A, Part One. Construction photographs of Powerhouse 2 and 2A.
photCL SCE

Visual Materials
[Big Creek Powerhouse 2 & 2a] [with 1 variant]
photCL SCE 06 - 70124

Visual Materials
Big Creek Powerhouse #2 & 2A [with 1 variant]
photCL SCE 06 - 70473

Visual Materials
Big Creek - Powerhouse #3 (part 2) [Generator floor with Units 1, 2, & 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Powerhouse #1 - penstock construction for Unit 3.]
photCL SCE 13 - vol 033

Visual Materials
Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]
photCL SCE 13 - vol 044