Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Portal Powerhouse



You might also be interested in

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - 12' diameter pipe installed to reduce pressure at portal during high flows. At time, the lower baffle was still there at outlet restricting end area.

    photCL SCE 02 - 43917

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Side spillway cut to relieve excessive back pressure during high flow. Final baffle now in place at end of penstock.

    photCL SCE 02 - 43928

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Close-up of 1500 cfs discharge from end of by-pass pipe - unrestricted end area.

    photCL SCE 02 - 43913

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - 1500 cfs flow thru by-pass pipe with unrestricted end area.

    photCL SCE 02 - 43912

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - By-pass pipe after installation of three horizontal baffles. With flow of 1000 cfs, upper two baffles were lost, due to excessive vibration.

    photCL SCE 02 - 43916

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Welding wye bend and setting by-pass pipe.

    photCL SCE 02 - 43726