Visual Materials
Portal Powerhouse
You might also be interested in

Portal Powerhouse
Visual Materials
Portal Powerhouse - 12' diameter pipe installed to reduce pressure at portal during high flows. At time, the lower baffle was still there at outlet restricting end area.
photCL SCE 02 - 43917

Portal Powerhouse
Visual Materials
Portal Powerhouse - Side spillway cut to relieve excessive back pressure during high flow. Final baffle now in place at end of penstock.
photCL SCE 02 - 43928

Portal Powerhouse
Visual Materials
Portal Powerhouse - Close-up of 1500 cfs discharge from end of by-pass pipe - unrestricted end area.
photCL SCE 02 - 43913

Portal Powerhouse
Visual Materials
Portal Powerhouse - 1500 cfs flow thru by-pass pipe with unrestricted end area.
photCL SCE 02 - 43912

Portal Powerhouse
Visual Materials
Portal Powerhouse - By-pass pipe after installation of three horizontal baffles. With flow of 1000 cfs, upper two baffles were lost, due to excessive vibration.
photCL SCE 02 - 43916

Portal Powerhouse
Visual Materials
Portal Powerhouse - Welding wye bend and setting by-pass pipe.
photCL SCE 02 - 43726