    Portal Powerhouse - 400 cfs flow from side channel spillway entering tailrace from new diversion.

    photCL SCE 02 - 43961

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - 12' diameter pipe installed to reduce pressure at portal during high flows. At time, the lower baffle was still there at outlet restricting end area.

    photCL SCE 02 - 43917

  • Portal Powerhouse - Discharge at side

    Portal Powerhouse - Discharge at side

    Visual Materials

    Portal Powerhouse - Discharge at side - channel spillway at approximately 1500 cfs flow thru tunnel.

    photCL SCE 02 - 43918

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - By-pass pipe after installation of three horizontal baffles. With flow of 1000 cfs, upper two baffles were lost, due to excessive vibration.

    photCL SCE 02 - 43916

  • Portal Powerhouse - Portal Forebay

    Portal Powerhouse - Portal Forebay

    Visual Materials

    Portal Powerhouse - Portal Forebay - Left end of dam from downstream side, showing spillway and pilot channel.

    photCL SCE 02 - 43787

  • Portal Powerhouse - Flow test

    Portal Powerhouse - Flow test

    Visual Materials

    Portal Powerhouse - Flow test - Uncompleted penstock flow approximately 1300 cfs.

    photCL SCE 02 - 43876