    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - 12' diameter pipe installed to reduce pressure at portal during high flows. At time, the lower baffle was still there at outlet restricting end area.

    photCL SCE 02 - 43917

  • Portal Powerhouse - Discharge at side

    Portal Powerhouse - Discharge at side

    Visual Materials

    Portal Powerhouse - Discharge at side - channel spillway at approximately 1500 cfs flow thru tunnel.

    photCL SCE 02 - 43918

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - installation of final design of restrictive baffle at end of by-pass pipe.

    photCL SCE 02 - 43927

  • Portal Powerhouse - Portal Forebay

    Portal Powerhouse - Portal Forebay

    Visual Materials

    Portal Powerhouse - Portal Forebay - Left end of dam from downstream side, showing spillway and pilot channel.

    photCL SCE 02 - 43787

  • Portal Powerhouse - Flow test

    Portal Powerhouse - Flow test

    Visual Materials

    Portal Powerhouse - Flow test - Uncompleted penstock flow approximately 1300 cfs.

    photCL SCE 02 - 43876

  • Portal Powerhouse - Forebay full

    Portal Powerhouse - Forebay full

    Visual Materials

    Portal Powerhouse - Forebay full - Slight spill over Spillway Tunnel Flow.

    photCL SCE 02 - 44598