Portal Powerhouse
You might also be interested in

Portal Powerhouse
Visual Materials
Portal Powerhouse - Temporary backing to reduce vibration in 3/8" plate bulkhead in turbine Wye branch inadequate; it was replaced with concrete disc back by I-beams.
photCL SCE 02 - 43898

Portal Powerhouse
Visual Materials
Portal Powerhouse - 12' diameter pipe installed to reduce pressure at portal during high flows. At time, the lower baffle was still there at outlet restricting end area.
photCL SCE 02 - 43917

Portal Powerhouse - Forebay
Visual Materials
Portal Powerhouse - Forebay - Installing 6" dia. drain in foundation, sluice pipe area, prior to any fill. Note form for concrete cutoff around pipe. One of three installed.
photCL SCE 02 - 43323

Portal Powerhouse
Visual Materials
Portal Powerhouse - Placing concrete in supporting wall under end of 12' diameter pipe. Excavating old concrete anchor. [Forming new] foundation & Wye branch anchor.
photCL SCE 02 - 43529

Portal Powerhouse
Visual Materials
Portal Powerhouse - View of forming for substructure concrete, showing neat excavation in tight decomposed granite for the draft tube encasement.
photCL SCE 02 - 43623

Portal Powerhouse
Visual Materials
Portal Powerhouse - Final leveling of Scroll Case prior to concrete encasement.
photCL SCE 02 - 44618