Visual Materials
Portal Powerhouse
- Description
- Portal Powerhouse - Final leveling of Scroll Case prior to concrete encasement.
- Date
- June 1956
- Call number
- photCL SCE 02 - 44618
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Portal Powerhouse - View of forming for substructure concrete, showing neat excavation in tight decomposed granite for the draft tube encasement.
photCL SCE 02 - 43623

Visual Materials
Portal Powerhouse - Forebay - Completed concrete encasement around 24" diameter sluice pipe through rock fill downstream section.
photCL SCE 02 - 43536

Visual Materials
Portal Powerhouse - Forebay - Progress picture showing placement of upstream impervious fill in sluice pipe area, to top of 24" sluice pipe concrete encasement.
photCL SCE 02 - 43327

Visual Materials
Portal Powerhouse - First stages of Scroll Case and Butterfly Valve.
photCL SCE 02 - 44617

Visual Materials
Portal Powerhouse - Installing backing I-beams (15") prior to forming for concrete. Strengthening to reduce vibration during high flows.
photCL SCE 02 - 43902