  • Portal Powerhouse - Forebay

    Portal Powerhouse - Forebay

    Visual Materials

    Portal Powerhouse - Forebay - Completed concrete encasement around 24" diameter sluice pipe through rock fill downstream section.

    photCL SCE 02 - 43536

  • Portal Powerhouse - Forebay

    Portal Powerhouse - Forebay

    Visual Materials

    Portal Powerhouse - Forebay - Progress picture showing placement of upstream impervious fill in sluice pipe area, to top of 24" sluice pipe concrete encasement.

    photCL SCE 02 - 43327

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Installing scroll case.

    photCL SCE 02 - 44616

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - First stages of Scroll Case and Butterfly Valve.

    photCL SCE 02 - 44617

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Installing backing I-beams (15") prior to forming for concrete. Strengthening to reduce vibration during high flows.

    photCL SCE 02 - 43902

  • Portal Powerhouse - Forebay

    Portal Powerhouse - Forebay

    Visual Materials

    Portal Powerhouse - Forebay - Installing 6" dia. drain in foundation, sluice pipe area, prior to any fill. Note form for concrete cutoff around pipe. One of three installed.

    photCL SCE 02 - 43323