Visual Materials
Portal Powerhouse
You might also be interested in

Big Creek, Huntington Lake Dams - Upstream Protection
Visual Materials
Big Creek, Huntington Lake Dams - Upstream Protection - Drilling 6" outlet hole with Concore drill thru Dam #2, for under drain system in steel facing back.
photCL SCE 02 - 43696

Portal Powerhouse
Visual Materials
Portal Powerhouse - Forebay - Excavating trench thru damp area in original ground downstream from relief hole R-24, for installation of perforated pipe drain.
photCL SCE 02 - 43701

Portal Powerhouse - Forebay
Visual Materials
Portal Powerhouse - Forebay - north along road alignment.
photCL SCE 02 - 43819

Portal Powerhouse
Visual Materials
Portal Powerhouse - Charging Skip-loader with concrete thru hole in top of 12' pipe, outside tunnel portal.
photCL SCE 02 - 43693

Portal Powerhouse - Forebay
Visual Materials
Portal Powerhouse - Forebay - Gunite lined tunnel hole.
photCL SCE 02 - 43810

Portal Powerhouse
Visual Materials
Portal Powerhouse - Placing reinforcing steel for concrete disc, steel plate bulkhead.
photCL SCE 02 - 43901