Visual Materials
Portal Powerhouse
You might also be interested in

Portal Powerhouse
Visual Materials
Portal Powerhouse - Placing reinforcing steel and forms for wye anchor.
photCL SCE 02 - 43769

Portal Powerhouse
Visual Materials
Portal Powerhouse - Progress: Forming and placing reinforcing steel for by-pass bend anchor.
photCL SCE 02 - 43741

Portal Powerhouse
Visual Materials
Portal Powerhouse - Temporary backing to reduce vibration in 3/8" plate bulkhead in turbine Wye branch inadequate; it was replaced with concrete disc back by I-beams.
photCL SCE 02 - 43898

Portal Powerhouse
Visual Materials
Portal Powerhouse - Starting reinforcing steel for upper portion of surge chamber structure.
photCL SCE 02 - 44820

Portal Powerhouse - Portal Forebay
Visual Materials
Portal Powerhouse - Portal Forebay - Bottom of vertical shaft in adit, shows upper portion of concrete bulkhead in adit.
photCL SCE 02 - 43790

Portal Powerhouse
Visual Materials
Portal Powerhouse - Placing concrete top left of center of powerhouse wall.
photCL SCE 02 - 43727