Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Borel Powerhouse - Borel 3rd Stage - Tilley #3 - Photos showing dismantlement of steel flume sheets. Old wood structure used in supporting forms for new concrete box flume.
photCL SCE 02 - 40076

Visual Materials
Borel Powerhouse - Kern River - Borel 3rd stage - Shows work accomplished on construction of new concrete flume at Tilley #3 prior to canal outage when steel flume can be removed. Concrete piers raised and backfilled for floor slab support with the exception of two center spans which were left open for drainage.
photCL SCE 02 - 40043

Visual Materials
Borel Powerhouse - Borel 3rd Stage - Tilley #3 - Photos showing dismantlement of steel flume sheets.
photCL SCE 02 - 40077

Visual Materials
Borel Powerhouse - Borel 3rd Stage - Tilley #3 - Preparation for support for floor slab in concrete box flume. Excavation through bulkhead at north end for new bulkhead and open transition.
photCL SCE 02 - 40075

Visual Materials
Borel Powerhouse - Borel 3rd Stage - Progress picture looking south from north end showing initial stages of the dismantlement of the metal flume.
photCL SCE 02 - 40066

Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - Progress picture showing placement of transit-mix concrete in pier forms - Overflow Dam.
photCL SCE 02 - 40051