    Kaweah #2 - Close-up inside Flume showing typical condition found in corner at junction of floor and side wall. Advanced pitting has extended through metal lining at center of bend. In general these holes are covered with rust scale and silt and not noticeable under casual inspection. Picture taken on section No. 1 near intake.

    photCL SCE 02 - 24131

  • Kaweah #2

    Kaweah #2

    Visual Materials

    Kaweah #2 - Flume close-up showing leakage through flume. This is typical of many places where the metal lining has rusted through at the junction of floor and side wall.

    photCL SCE 02 - 24132

  • Kaweah #2

    Kaweah #2

    Visual Materials

    Kaweah #2 - 2 Flume - Close-up showing space between boards on side of flume. This condition made it necessary to leave steel sheets in place to support asphalt paper and emulsion re-lining.

    photCL SCE 02 - 24805

  • Kaweah #2

    Kaweah #2

    Visual Materials

    Kaweah #2 - 2 Flume - View of re-lining. Asphalt roofing paper and batts in place, but before final spray coat of emulsion. .

    photCL SCE 02 - 24808

  • Kaweah #2

    Kaweah #2

    Visual Materials

    Kaweah #2 - new footings for steel replacement of flume #6

    photCL SCE 02 - 28382

  • Kaweah #2 - Flume #13

    Kaweah #2 - Flume #13

    Visual Materials

    Kaweah #2 - Flume #13 - Support Steel.

    photCL SCE 02 - 26864