Visual Materials
Big Creek, Florence Lake Dam - Close-up
- Description
- Big Creek, Florence Lake Dam - Close-up of thermometer resistances in place on upstream surface of Arch #6 prior to grouting in.
- Date
- Feb. 1940
- Call number
- photCL SCE 02 - 22865
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Close-up of open seam of extrados surface Arch 9 at elevation 7296 near crown of arch.
photCL SCE 02 - 22165

Visual Materials
Big Creek, Florence Lake Dam - Close-up of guniting extrados of Arch #2. Dock coating was applied to days work joints prior to laying galvanized mesh.
photCL SCE 02 - 22887

Visual Materials
Big Creek, Florence Lake Dam - Close-up of 9" sealing plate, and reinforcing mesh in place in lower horizontal key prior to guniting Arch 13.
photCL SCE 02 - 24701

Visual Materials
Big Creek, Florence Lake Dam - Chipping for downstream surface thermometer resistance on intrados of Arch #6. Elevation 7313, 2 ft. east of center line
photCL SCE 02 - 22864

Visual Materials
Big Creek, Florence Lake Dam - Close-up view of downstream side of Arch #53
photCL SCE 02 - 23378

Visual Materials
Big Creek, Florence Lake Dam - Close-up on Arch #51 surface.
photCL SCE 02 - 25957