    Big Creek Powerhouse No. 2 and 2A, Maintenance

    Visual Materials

    Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.

    photCL SCE

  • Big Creek - Powerhouse #2, & 2a - maintenance

    Big Creek - Powerhouse #2, & 2a - maintenance

    Visual Materials

    Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]

    photCL SCE 13 - vol 044

  • Big Creek Powerhouse 2 & 2a

    Big Creek Powerhouse 2 & 2a

    Visual Materials

    Big Creek Powerhouse 2 & 2a - Transmission crew disconnecting 2A-8, 220kV line.

    photCL SCE 02 - 28238

  • Big Creek Powerhouse 2 & 2a - Switchyard

    Big Creek Powerhouse 2 & 2a - Switchyard

    Visual Materials

    Big Creek Powerhouse 2 & 2a - Switchyard - cutting off 2A-8, 220kV lines.

    photCL SCE 02 - 28236

  • Big Creek - Powerhouse #2 & 2a (part 2)

    Big Creek - Powerhouse #2 & 2a (part 2)

    Visual Materials

    Big Creek - Powerhouse #2 & 2a (part 2) [Powerhouse 2 & 2A - auto transformers, substation, new 6.6kV line, new bridge for powerhouse extension, Unit #4 with direct connected exciter, constructing new Unit #4, 150kV - 220kV Bushings, switchboard, installation of new Unit #4 penstock, concrete plant, incline batch cars, stand pipes, Unit #3 foundation, Unit #3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit #3, auto circuit breakers, 150kV Oil Switch, new hoist, auto-transformers, and 11kV equipment, new Bus Bar installation, Governor #4; Camp #7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp #5 - forebay construction, batch plant, steam shovel excavating.]

    photCL SCE 13 - vol 030

  • Big Creek Powerhouse #2 & 2a

    Big Creek Powerhouse #2 & 2a

    Visual Materials

    Big Creek Powerhouse #2 & 2a, penstocks and Switch garden across San Joaquin River

    photCL SCE 05 - 53951