Boulder-Chino Transmission Line



You might also be interested in

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - Lava at Mile 135-2

    photCL SCE 02 - 20230

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - Setting footings at Mile 9-2.

    photCL SCE 02 - 20239

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - Stark crew at Mile 15-2 setting stubs.

    photCL SCE 02 - 20238

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Also showing existing slope of ground. Vertical rod at 5.5', horizontal rod at 8.9'. Rods on centerline, facing northwesterly.

    photCL SCE 02 - 27890

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 at mile 103. Detail of vertical bank facing north. Material below 1.3' is fine gravel. Material above is clay. Bank about 8.5' high.

    photCL SCE 02 - 27893

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 mile 103. 12' rod against vertical bank at right. 9' rod is 8.5' left and level with 12' rod. Both rods on centerline. Tower at left. Looking northeasterly.

    photCL SCE 02 - 27895