Visual Materials
Boulder-Chino Transmission Line (3rd)
- Description
- Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Also showing existing slope of ground. Vertical rod at 5.5', horizontal rod at 8.9'. Rods on centerline, facing northwesterly.
- Date
- 12/11/1947
- Call number
- photCL SCE 02 - 27890